A close-up of the derailer and interlocking removed to allow a drainage channel to the creek from the new silo area. (9-Apr-2005)
[Copyright: Stephan Delaney]
A close-up of the derailer and interlocking removed to allow a drainage channel to the creek from the new silo area.
Link