A Werris Creek coal train, in push-pull configuration, loads at the newly constructed loading bin. This loading point is utilising a section of track from the old Gap - Werris Creek South Junction section. (23-Dec-2005)
[Copyright: Chris Smart]
A Werris Creek coal train, in push-pull configuration, loads at the newly constructed loading bin. This loading point is utilising a section of track from the old Gap - Werris Creek South Junction section.
Link