Sorry, user registration is not yet available!

Wagga Wagga Station

Frame D controlled the operations of points & catch points between the 2 loco sidings and Nos 1, 2 & 3 sidings. 1. (1980)
[Copyright: Graeme Skeet ]

Frame D controlled the operations of points & catch points between the 2 loco sidings and Nos 1, 2 & 3 sidings. 1.
[back to Wagga Wagga Station]