Boronia No 5 Tunnel |
Boronia No 4 Tunnel
Hawkesbury River
|
| Main facility: | Tunnel (Closed) | ||||
| Lines: |
Main North Line |
||||
| Location: | line-map (151.2018°, -33.5522°) GDA94 | ||||
| Distance: | unknown km from Sydney | ||||
| History: |
|
||||
| Photos: | 1980, 2007 | ||||
| Description: | A 74m double-track tunnel that was bypassed in 1909as a result of improvements to curves during the duplication of the line. Although the bore is sufficient for double track use, only one track was ever laid. | ||||
| Current status: | The tunnel is abandoned. |
Photographs
